For Tier 1 & Main Contractors

Flowing Screed for Main Contractors, Delivered to Programme

Supply and lay flowing and traditional screed with supervised crews, on-site batching and up to 1,000m² a day. Established in 1987.

Get a Screeding Quote & Programme Plan Call 0330 223 2364
Certainty Delivered.
CSC Screeding operative levelling Tarmac TopFlow Horizontal flowing screed with a dappling bar at Royal Berkshire Hospital for MTX Contractors

Royal Berkshire Hospital, Reading: 1,300m² of flowing screed for MTX Contractors.

In short: CSC Screeding is a supply and lay screeding contractor for Tier 1 and main contractors across London and the South East. We lay flowing screed and Isocrete screeds with supervised crews, batch on site with our Maverick truck where storage is tight, and lay up to 1,000m² a day. Established in 1987. Certainty Delivered.

The Screed Risks That Hit Your Programme

Screed sits on the critical path. When it goes wrong, every following trade waits. Here's how we take those risks off your desk.

📅

Programme slip

Waiting on ready-mix plants, missed pour dates and slow areas push handover back.

Our own Maverick batches on site, so the pour isn't tied to a plant's schedule.

🔁

Rework

Floors that fail level checks mean breaking out, re-pouring and re-programming.

Specification checked before we start and floors levelled with dappling bars.

👷

Poor supervision

Unsupervised gangs leave your site team chasing quality and paperwork.

Supervised CSC crews on every pour, with clear communication to your site team.

🏙️

Logistics & no storage

City sites have no room for sand, cement or silos, and tight access for deliveries.

Maverick needs no storage on your site, just a pit lane. Pumping up to 120m for flowing screed and 150m for traditional. Meet the Maverick.

How We Work With Main Contractors

Supply and lay only. One accountable screed partner from tender to handover.

Tender

Send drawings, spec and programme. We return a price and a programme plan.

Pre-start

RAMS, method statement and pour plan agreed with your site team, including access and pit lane.

Supervised pour

Our crew batches on site with Maverick and lays up to 1,000m² a day.

Handover

A finished floor ready for drying and the next trade, with clear records for your QA.

Proof From Real Jobs

Recent and current projects for contractors.

Healthcare · MTX Contractors

Royal Berkshire Hospital, Reading

1,300m²

Tarmac TopFlow Horizontal flowing screed, laid and levelled with dappling bars across open floor plates.

Retail · Forum Contracts

Lidl Caterham

3 weeks → ~5 days

No space to store materials. Maverick worked from a loading bay and cut the screed programme from three weeks to around five days.

Read the case study →
Current project
Education · Morgan Sindall Construction

Great Haddon Primary School

Isocrete K Screed

Floating Isocrete K Screed at 75mm over insulation on the ground floor and over an acoustic resilient layer on the upper floors, laid to a project Inspection & Test Plan with hold points and pre-screed checks.

Isocrete Screed Systems

As a Flowcrete Approved Installer of Isocrete K-Screed, CSC supplies and lays Isocrete semi-dry cementitious screeds for programmes where the floor needs to be trafficked or overlaid quickly.

Isocrete K-Screed

A semi-dry screed with a water-reducing K-Additive for earlier drying and higher strength. Standard K-Screed suits most applications, with Heavy Duty K-Screed for heavily trafficked areas. It can be laid bonded, unbonded or floating, including over underfloor heating.

Used by CSC at Great Haddon Primary School for Morgan Sindall (current project) and at Lily's Walk, a 27,000m² residential development for Inland Homes.

Isocrete Fast-K Screed

A semi-dry screed with accelerating, water-reducing and shrinkage-compensating additives for high early strength and rapid drying. Flowcrete positions it for fast-track new build and refurbishment, such as schools, hospitals and retail, where following trades need to get on quickly.

Isocrete Ultimate K-Screed

An early drying, rapid strength semi-dry screed. Flowcrete states a 24-hour walk-on, a 3-day drying time and over 40N/mm² compressive strength, and use over underfloor heating at thicknesses as low as 50mm. It can be laid bonded, unbonded or floating, often thinner than traditional sand and cement.

Used by CSC at Uniqlo, St David's Shopping Centre, Cardiff: 1,671m² bonded with Isocrete Polymer 70.

Product descriptions and figures are from Flowcrete's published product information. Performance depends on the specification and site conditions.

Trusted by Contractors

Morgan Sindall logo, CSC Screeding client Volker Fitzpatrick logo, CSC Screeding client Kingerlee logo, CSC Screeding client Princebuild logo, CSC Screeding client Curo logo, CSC Screeding client Forum Contracts logo, CSC Screeding client

Built on Standards

FlowcreteApproved Installer – Isocrete K-Screed
ISO 9001Certified via Core3
ConstructionlineGold
AcclaimAccredited
CHASPremium
Builders ProfileApproved
British StandardsFormer committee member
Health & SafetyAnnual external audit

Main Contractor FAQs

Do you supply and lay, or labour only?

We supply and lay. CSC provides the materials, batching, pumping and supervised crew, so you deal with one accountable screed subcontractor.

How much screed can you lay in a day?

Up to 1,000m² a day, depending on the site, access and specification.

We have no storage space on site. Can you still work?

Yes. Our Maverick truck batches flowing screed on site and needs no storage area, just a pit lane such as a loading bay or agreed kerbside section.

How far can you pump screed?

Up to 120m for flowing screed and up to 150m for traditional screed.

What accreditations do you hold for prequalification?

Flowcrete Approved Installer – Isocrete K-Screed, ISO 9001 (via Core3), Constructionline Gold, Acclaim, CHAS Premium and Builders Profile approved, with an annual external health and safety audit.

Do you install Isocrete screeds?

Yes. CSC is a Flowcrete Approved Installer of Isocrete K-Screed, and we supply and lay Isocrete K-Screed bonded, unbonded or floating, including over insulation and acoustic layers. We have also laid Isocrete Ultimate K-Screed, for example at Uniqlo Cardiff.

How long has CSC Screeding been operating?

CSC Screeding was established in 1987.

Send Us Your Tender

Email [email protected] and include:

  • Tender invitation or document download link
  • Drawings
  • Specification
  • Programme
  • Tender return date
Email Your Tender

Got Screed on Your Next Programme?

Send us the drawings, spec and programme. We'll come back with a price and a programme plan.

Get a Screeding Quote Call 0330 223 2364
Certainty Delivered.