Maverick is our 44-tonne on-site batching screed truck. It pulls in, batches fresh flowing screed on the spot and pumps it straight to your floor, then pulls out. Floors handed over ready for the floor finish.
Book a free Risk ReviewCity sites rarely have space for silos, sand bays or bulk bags. Maverick carries everything it needs on board, so there is nothing to store and nothing left behind. It batches exactly what the floor needs, when it needs it, under a computerised batching system run by our own team.
What about supply? Ready-mix lorries stuck in traffic? That's a real problem on congested sites. On suitable sites, we at CSC batch flowing screed on site with the Maverick. The Maverick produces flowing screed only.…
AI-generated podcast from the CSC Knowledge Base. Listen to the full episode
Plot after plot, poured on your programme. Fresh flowing screed batched on site means the gangs keep moving and your plots move on to the floor finish.
Quality and supervision you can audit: controlled batching, our own operatives and site management, testing on completion. Fewer surprises, better margin.
Fast-track programmes need certainty on the date. Maverick removes the waiting for deliveries and the storage problem, so the floor is ready when the next trade arrives.

Maverick batches and pumps flowing screed only. For sand and cement or Isocrete K-Screed, our specialist crews install using the right plant for the job.
From Dublin Airport Terminal 2 to city-centre retail and residential schemes, CSC has screeded over 2,900 projects since 2010. Head office: Langley, Berkshire.
Flowcrete Approved Installer of Isocrete K-Screed.

On Ballymore's Brentford Lock scheme in west London, CSC is installing around 17,000m² of flowing screed to Blocks E and J (six floors per block) using Maverick. Rather than storing sand and binder on a tight urban site, Maverick batches flowing screed on the spot and pumps it straight to each floor, with the truck route agreed with the site team at tender stage through a marked-up logistics plan.
Progress: work started in April 2026. All upper floors are now complete, with the ground floors to follow.




Send us your programme and site details. We will look at access, pumping route, programme and floor finish, and tell you plainly whether Maverick suits your job.