Screed Knowledge Base
Honest answers to the questions buyers actually ask about floor screed, including the ones most contractors avoid: cost, problems and downsides.
Start here
- Cost & pricingHow much does floor screed cost?
Why there is no honest single price, what moves the cost and how to compare quotes like for like.
- ComparisonsLiquid screed vs traditional screed: the honest comparison
Flowing vs sand and cement: speed, drying, thickness, underfloor heating and the honest downsides of each.
- How it worksHow long does screed take to dry? By type and thickness
Drying by type and thickness, what slows it, and how to prove a screed is ready for finishes.
Episode 1: Liquid vs traditional screed
AI-generated podcast from the CSC Knowledge Base. Two AI hosts, Isla and Cillian, talk through our articles in under five minutes (4:55).
Flowing or traditional sand and cement: laying speed (about 400 m² a day vs about 120 on average), the honest downsides of each, why no contractor can give one fair price per m² without seeing the job, on-site batching with the Maverick, and why drying, not laying, is usually the critical path.
Voices are AI-generated. Based on: Liquid vs traditional · Cost · Drying times. Always follow the product data sheet.
Read the transcript
Isla: Welcome to the CSC Knowledge Base podcast. Today, a question we hear on almost every site. Liquid screed or traditional sand and cement. Which one should you choose?
Cillian: And the honest answer is, it depends on the job. We lay both, plus other systems, so there's no reason for us to push either one.
Isla: Let's start with the basics. What's the actual difference?
Cillian: Traditional screed is a semi-dry mix of sand and cement. It's placed, compacted and hand finished to level by screeders working from datums. Liquid, or flowing, screed is a fluid mix that's pumped into place and levelled with a dappling bar, so it settles to an even surface.
Isla: And most flowing screeds are calcium sulphate based, aren't they?
Cillian: Most are, yes, though cement-based flowing screeds exist too. Every product has its own data sheet for thickness, drying and finishing.
Isla: So let's talk speed, because that's usually the first question.
Cillian: On average, our crews lay about four hundred square metres a day of flowing screed, and about a hundred and twenty square metres a day of traditional. Those are averages, not guarantees. The site sets the real figure.
Isla: That's a big gap on a large floor plate.
Cillian: It is. On big open areas it can take days off the screed programme. Flowing screed also self-levels, it surrounds underfloor heating pipes with no air voids, and it's often thinner for the same construction.
Isla: But it's not all good news. What are the downsides?
Cillian: The site has to be ready. The area must be sealed so screed can't leak through gaps, the edge strip and membrane fitted carefully, and underfloor heating pipes fixed down, or they can float. It's not suited to falls to drains, and on small or broken-up areas the set-up cost can outweigh the speed.
Isla: So where does traditional screed win?
Cillian: Small rooms, steps, falls and awkward shapes. Bathrooms and wet rooms. Bonded toppings on a slab. It's more tolerant of an imperfect site. The trade-off is that it's slower, and the quality depends heavily on the screeder's compaction.
Isla: Let's talk money. Can you give a price per square metre?
Cillian: Honestly, no. No contractor can give one fair price without seeing the job. Type, thickness, area, access, pumping distance, underfloor heating, programme and the number of visits all move the cost.
Isla: So what should people do with a cheap quote?
Cillian: Compare like for like. Check what's included. Number of visits, pumping, surface preparation, testing. A cheap quote that leaves things out often costs more later.
Isla: And is flowing screed more expensive?
Cillian: The material usually costs more. But on large open areas, the speed and thinner section often close or reverse the gap. On small areas, traditional is usually cheaper overall.
Isla: What about supply? Ready-mix lorries stuck in traffic?
Cillian: That's a real problem on congested sites. On suitable sites, we at CSC batch flowing screed on site with the Maverick. The Maverick produces flowing screed only. Traditional screed is mixed and pumped with separate equipment.
Isla: Now, drying. This is where programmes go wrong.
Cillian: Drying, not laying, is usually the critical path. For calcium sulphate flowing screed, manufacturers commonly publish about one millimetre a day up to forty millimetres, then about half a millimetre a day beyond that.
Isla: So what about a fifty millimetre screed?
Cillian: About forty plus twenty, so roughly sixty days drying naturally. But flowing screed, both calcium sulphate and cement based, can be force dried after one week. Traditional sand and cement screed takes much longer.
Isla: And those are good conditions.
Cillian: Exactly. They're averages in good drying conditions. A cold, closed building in winter can be much slower. Covering the floor too early, poor ventilation and wet trades like plastering all slow it down. And the product data sheet always takes precedence over any rule of thumb.
Isla: So how do you know it's actually dry?
Cillian: You test it. Don't guess from the calendar. Before resilient floor coverings, a base is commonly required to be below seventy-five per cent relative humidity, using the hygrometer method, unless the flooring manufacturer says otherwise.
Isla: So the takeaway?
Cillian: Choose the screed to suit the job, choose the product early so the programme comes from its data sheet, and always moisture test before the floor finish goes down.
Isla: That's it for this episode. For more, head to the Knowledge Base on the CSC Screeding website. Thanks for listening.
More articles on cracking, moisture testing, choosing a contractor, specifications and handover are on the way.
Meet the Screed Scientist
Spencer Warner, former BSI committee member, reviews every article. CSC Screeding, Established in 1987. Spencer also writes as the Screed Scientist at screedscientist.com.
Why trust these answers?
- Over 3,000 projects since 2010
- We lay both flowing and traditional screed, so we have no reason to oversell either
- On average about 400 m² a day of flowing and about 120 m² a day of traditional screed
- ISO 9001, Constructionline Gold, CHAS Advanced, Builders Profile, Local Supply Chain and THSP; Isocrete (Flowcrete) Approved Contractor
Can't find your question?
Ask us and we will answer it, and probably write it up here.