
London UFH Project for Hermes
We’re currently on site in London carrying out an underfloor heating installation for Hermes, using Roth UK product.
This is one of those projects where the timing matters just as much as the work itself. A critical date has been set to get in and complete the works around this point in the year, and it’s good to be trusted with that responsibility.
There’s nothing flashy about this stage of a project. It’s about preparation, accuracy, and making sure everything is done properly before the next trade comes in. Once underfloor heating is covered, there’s no easy way back, so it has to be right first time.
The team have approached this job exactly how it should be done. Calm, focused, and methodical. No rushing. No shortcuts. Just solid work.
Projects like this are a good reminder that the basics, done consistently well, are what keep everything moving in the right direction.
