img

CSC’s floor screeding reaches new heights

October 24, 2024•1 min read

June 2011

CSC Floor Screeding operatives stand back and watch our screed pump being lifted over the building at a construction site for PDR Builders.

The general access to the project is limited and CSC strategically plan the operational process to include sand deliveries in dumpy bags on a flat bed truck. The tower crane will directly lift the sand into place from the roadside.

Back to Blog