
CSC’s floor screeding reaches new heights
June 2011
CSC Floor Screeding operatives stand back and watch our screed pump being lifted over the building at a construction site for PDR Builders.
The general access to the project is limited and CSC strategically plan the operational process to include sand deliveries in dumpy bags on a flat bed truck. The tower crane will directly lift the sand into place from the roadside.