BLOG

Twickenahm Film Studios

Flawless SCC Pour at Twickenham: Tarmac TopFlow Horizontal in Action

March 07, 20251 min read

At CSC Screeding, we take pride in delivering precision and efficiency on every project. Our latest challenge? An 80m³ self-compacting concrete (SCC) pour at Twickenham Stadium, using Tarmac TopFlow Horizontal—a high-performance solution designed for seamless, high-quality finishes.

Why SCC?

Self-compacting concrete is a game-changer in projects requiring smooth, level surfaces with minimal intervention. With its excellent flowability and reduced need for manual compaction, SCC speeds up the process while maintaining exceptional quality.

Precision in Motion

On-site at Twickenham, our team worked efficiently to ensure even distribution and perfect levelling of the Tarmac TopFlow Horizontal mix. This innovative SCC product allows for superior surface tolerance and faster installation making it the ideal choice for large-scale, high-spec projects like this one.

With 80m³ poured seamlessly, this project showcases our expertise in handling complex screeding jobs with accuracy, efficiency, and a commitment to quality.

📽 Watch the full video from our Twickenham pour to see our team in action!

👉 Need a specialist for your SCC or screeding project? Get in touch with CSC Screeding today or subit your quote at https://cscscreeding.co.uk/Request-A-Quote

Spencer Warner

Managing Director - CSC Screeding

Back to Blog

Phone

Email

Address

Unit 2, Cherry Orchard Nursery,

Trenches Lane,

Slough, SL3 6DH

Unit 2, Cherry Orchard Nursery,

Trenches Lane, Slough, SL3 6DH

Useful Links

VAT Number:GB480 0588 46

Company Number: 4725870

VAT Number:GB480 0588 46 Company Number: 4725870

Copyright 2024 CSC Screeding. All rights Reserved. Designed and Developed by JDR Group.