Underfloor Heating Screeding

IS IT RIGHT FOR THE JOB?

Underfloor Heating Screeding

The underfloor heating elements are typically enclosed within a layer of screed before the final floor covering is installed. In the case of hydronic underfloor heating, the heating pipes are usually secured to insulation panels on the floor slab with moisture barriers, and the screed layer is then laid over this to create a level surface for the final floor finish.

While traditional sand and cement screeds are commonly used for underfloor heating, they can be time-consuming as they require ample drying time before the final floor covering can be applied. It's important to note that using the underfloor heating system to speed up the drying process can lead to the screed cracking due to rapid drying.

Underfloor Heating

The heating elements for the underfloor heating are typically enclosed in a layer of screed before the final floor covering is installed. In the case of hydronic underfloor heating, the heating pipes are secured to insulation panels on the floor slab with moisture barriers, and the screed layer is then applied to create a level surface for the final floor finish.

Although traditional sand and cement screeds are commonly used for underfloor heating, this process can be time-consuming as the screeds need ample time to dry before the final floor covering can be applied. It is important to note that using the underfloor heating system to speed up the drying process may lead to cracks in the screed due to rapid drying.

Underfloor heating (UFH) is an incredibly efficient space heating solution that works by distributing heat through electric or hydronic heating elements embedded beneath the floor surface. These elements are typically secured to insulation panels laid over the floor slab, with a screed layer applied on top before the final floor finish is installed.

At CSC Screeding, we understand the importance of a high-quality screed in enhancing UFH performance. The screed not only provides a level surface for the final flooring but also plays a critical role in evenly conducting heat across the floor, preventing hot or cold spots. When laid to the correct depth, a well-designed screed helps retain heat for longer, reducing energy consumption and boosting the overall efficiency of the heating system.

As part of our commitment to delivering the best underfloor heating solutions, CSC Screeding partners with Roth UK, a trusted supplier of UFH systems. We offer a wide range of screeding options tailored to meet the specific needs of underfloor heating installations.

Underfloor heating (UFH) is an incredibly efficient space heating solution that works by distributing heat through electric or hydronic heating elements embedded beneath the floor surface. These elements are typically secured to insulation panels laid over the floor slab, with a screed layer applied on top before the final floor finish is installed.

At CSC Screeding, we understand the importance of a high-quality screed in enhancing UFH performance. The screed not only provides a level surface for the final flooring but also plays a critical role in evenly conducting heat across the floor, preventing hot or cold spots. When laid to the correct depth, a well-designed screed helps retain heat for longer, reducing energy consumption and boosting the overall efficiency of the heating system.

As part of our commitment to delivering the best underfloor heating solutions, CSC Screeding partners with Roth UK, a trusted supplier of UFH systems. We offer a wide range of screeding options tailored to meet the specific needs of underfloor heating installations.

View Our

Specialist Screeding Systems

Traditional Screed

Fast Drying

Free Flowing

Underfloor Heating

Structural Screed

DPM, Radon Primers & Accessories

Insulation Screed

Substrate Floor Key & Bonding Prep

Traditional Screed

Fast Drying

Free Flowing

Underfloor Heating

Structural Screed

DPM, Radon Primers & Accessories

Insulation Screed

Substrate Floor Key & Bonding Prep

Floor Leveling Compounds

Floor Leveling Compounds

What We Have Done

Our Work

Image

HIGH WYCOMBE

Centre Square, Lily’s Walk

CSC Screeding secured the insulation and floor screeding package at the landmark High Wycombe development called Centre Square at Lily’s Walk for Inland Homes Plc.

Image

LONDON

Prince of Wales Drive

CSC Screeding were engaged by Berkeley Group to carry out Calcium Carbide testing, on anhydrite screed with underfloor heating, throughout their development at Prince of Wales Drive.

Testimonials

Our Clients’ Thoughts

Slider 1

Live News

The Screeder’s Journal

Follow Us

Get in Touch

Request A Quote

If you are interested in our services and would like a quote, simply fill in the form provided and a member of our team will be in touch.

What We’re Up To

Latest From The Blog

CSC Screeding's Campkin Road Project Featured in Construction Industry News: Winner of Best Large Social Housing Development at LABC East Anglia Awards 2024

September 2024

We are thrilled to announce that CSC Screeding's work on the Campkin Road project has been featured in the prestigious Construction Industry News magazine. The project was...

CSC Screeding Joins Watford FC as a Regional Partner

September 2024

CSC Screeding is thrilled to be apart of the Watford FC Regional Partner Programme with Eleven Sports Media, marking an exciting chapter.

CSC at Lot M3!

September 2024

CSC Screeding is proud to be working on behalf of Hills Group UK on the prestigious Lot M3 project in Cambridge. This landmark development is part of Cambridge University’s...

Innovation, implementation & collaboration

Our Accreditations

CSC Screeding are members of Constructionline, CHAS and Builders Profile where a predefined Health & Safety questionnaire is pre-completed and our clients have direct access to the information. Documents contained in the pre-qualification system are updated throughout the year, ensuring continued compliance. We have focused on developing the business through constant innovation, implementation and collaboration.

We were an early adopter of FORS – gaining Bronze accreditation – as we recognised this would become more widely requested on construction sites.

We are now ready for the business to grow with the increasing demand.

CSC Screeding are members of Constructionline, CHAS and Builders Profile where a predefined Health & Safety questionnaire is pre-completed and our clients have direct access to the information. Documents contained in the pre-qualification system are updated throughout the year, ensuring continued compliance. We have focused on developing the business through constant innovation, implementation and collaboration.

We were an early adopter of FORS – gaining Bronze accreditation – as we recognised this would become more widely requested on construction sites.

We are now ready for the business to grow with the increasing demand.

Phone

Email

Address

Unit 2, Cherry Orchard Nursery,

Trenches Lane,

Slough, SL3 6DH

Unit 2, Cherry Orchard Nursery,

Trenches Lane, Slough, SL3 6DH

Useful Links

VAT Number:GB480 0588 46

Company Number: 4725870

VAT Number:GB480 0588 46 Company Number: 4725870

Copyright 2024 CSC Screeding. All rights Reserved. Designed and Developed by JDR Group.