Screeding for Regional House Builders
Apartment blocks for Regional House Builders building for developers and holding companies. We plan the pour floor by floor, then hand each floor over ready for the finishes.
Established in 1987. Over 3,000 projects since 2010.
Programme certainty, floor by floor
On an apartment block, the screed sits in the middle of the programme. If it is late or out of level, every trade after it waits. We plan the work so each floor can be handed over and the next trades can keep moving.
Handover per floor
Each floor is handed over ready for the floor finish, so follow-on trades are not waiting on a whole block to be finished.
Sequencing
We plan each visit around the floors that are ready, and we work to your build programme on site.
Readiness
Levels are set out on every floor before the pour, so the finished floor is flat and consistent from the first floor to the last.
Testing
Flow tests are done on site for flowing screed. Before finishes go down, the floor needs a proper moisture test, not just a dry-to-touch check. We also offer screed testing.
Record keeping
The same method is used on every floor, with the checks recorded so there is a clear trail at handover. See The pour is finished. Is the floor ready?
Apartment blocks
Built for Regional House Builders delivering apartment blocks for developers and holding companies.
Named proof: Brentford Lock
On Phase 2a of Ballymore’s Brentford Lock scheme in West London, we laid around 17,000m² of flowing screed across Blocks J and E, two residential blocks of six floors each, with apartments and corridors.
Supply was a mix of on-site Maverick batching and premixed flowing screed, so it could flex with the pour programme. Levels were set out on every floor before the pour, with flow tests on site. Flowing screed was laid over the apartments’ underfloor heating, which was installed by others. Floors were handed over block by block, ready for the floor finish.
The programme ran from April 2026 to November 2026.
How the screed gets to the floor
We use traditional screed pumps and Maverick automated screed trucks. The right method depends on the site, the specification and the programme.
Traditional screed pumps
We still use conventional pump trucks for traditional sand cement and flowing screed where they suit the site and the specification. Pump access is planned with you before the pour, not left as a surprise on the day.
Maverick automated screed trucks
The Maverick batches flowing screed fresh on the truck and pumps it into the building. It does not need a yard or a compound. It needs a pit lane. That is how we batched the screed at Arundel Great Court. More about the Maverick.
Built for Regional House Builders
This page is for Regional House Builders building apartment blocks for developers and holding companies. We also still carry out other residential work, but the offer here is programme certainty on multi-storey blocks, not a one-off house pour.
Established in 1987. Over 3,000 projects since 2010. If you want to see how a large residential scheme was planned floor by floor, start with Brentford Lock and Arundel Great Court, or browse our work.
Common questions
Questions we are asked by House Builders planning apartment blocks.